Blackpool Victoria Hospital
Aseptic Suite - Grade B, C and D
Bassaire were awarded the contact to design & build, commission and validate the existing non-compliant pharmacy aseptic suite, following a strict tender process where experience, cost, quality, value engineering, management and design capability were extensively reviewed.
The suite successfully operates as a grade C background in the 4-cytotoxic and CIVAS isolator rooms, the necessary changing rooms and support areas. The HVAC plant has been selected and designed for future proofing to allow the facility to operate to a grade B standard if and when required.
Angela Nelson stated that she is very pleased with the project and will definitely be recommending Bassaire to other Trusts. She went on to state a special thank you should go to Martin Doherty, the supervisor, for the way he has managed the project:
"He has been helpful, authoritative, and generally made sure the project ran smoothly" - Angela Nelson - Assistant Director of Pharmacy, Support Services Pharmacy Department
"The Trust have taken possession of an excellent facility, completing the project within very tight timescales" - Craig Tilley - Aseptic and Technical Services Manager